"John erected the logs for our 1,000 square-foot cabin, located on the Wade Lake bench south of Ennis, starting in November, 1991. He and his crew proceeded to finish the cabin during the winter of ‘91-’92, completing it in June. We can not say enough about John’s conscientious and skillful work. We have remained entirely satisfied with the high-quality finish of our cabin. There has been no settling of the logs. For example, the snug fit of wallboard around the ceiling logs looks the same as when it was completed in ’92.".
- Eugene and Karen Welch
"Our cabin is "Off-the-Grid" and John designed and installed our solar electrical system. He also installed a rain water catch basin that provides all of our non-potable water. These systems have performed flawlessly, thanks to John."
- Eugene and Karen Welchh